News

Victoria Street Concept Plan is now out for consultation

16 November 2026

In response to community feedback and further investigation, we’re proposing:

  • Road renewal: Renew the road, kerb and gutter works between Military Road and East Terrace to improve road condition and drainage performance.
  • Improved drainage: Install new stormwater drainage infrastructure to better manage surface water and reduce water pooling along the street.
  • Future pedestrian connection: Narrow the road to approximately 7.2 metres to accommodate a future 1.5-metre-wide northern footpath with permeable paving and accessible pedestrian ramps, while retaining parking on both sides, protecting established trees and encouraging lower vehicle speeds.

All proposed improvements are designed to try and preserve the existing streetscape and residential character of Victoria Street.

We want to hear from you:

  • Do you support the proposed footpath and road adjustments?
  • Do you have any other comments or feedback about the proposed design?

Your input will help shape the final design for Victoria Street.

View the concept design here and have your say by Sunday 13 December 2026.