News

BMX concept going to the next Council meeting

20 August 2026

BMX workshop photo

Thank you to everyone who contributed to the Stage 1 and Stage 2 consultation process for the proposed BMX track at Grange Recreation Reserve.

Stage 2 consultation was conducted from 5 May to 27 May 2026 and we received 132 contributions including 106 survey responses, 7 written responses and 19 people attended our drop-in session. Most people who participated are local, with 92% of respondents living nearby and 98% residing within the City of Charles Sturt.

Survey responses demonstrated high levels of support across the four design elements:

1. 80% supported the two-zone concept (Beginner and Intermediate Zones)

2. 79% supported the Beginner Zone being located near the playground

3. 84% supported the Intermediate Zone being located in the natural depression

4. 74% supported dirt tracks for both zones

Positive sentiment from our community included:

  • Great opportunity
  • Great for kids and getting them active and outdoors
  • Local teenagers have been building their own BMX tracks in the area so it’s good that council is proposing a new BMX track

During the consultation, some concerns were raised about loss of open space, antisocial behaviour and safety. You can read the full Community Engagement Summary Report in the Document Library on the Project Page.

The recommended concept has been informed by community feedback, site opportunities and constraints, and the available project budget. In response to feedback received during Stage Two consultation regarding the retention of open space, the overall footprint of the BMX track has been reduced to preserve additional turf areas used for dog exercise and other informal recreation activities. The proposed BMX track will provide a dedicated facility catering for beginner to intermediate riders, with a focus on delivering a safe, inclusive and engaging riding experience.

Following Council's consideration at the Council Meeting on Monday, 24 August 2026, the next step is to proceed to detailed design and construction. Following construction, Council will monitor usage, maintenance requirements and community feedback to inform any future improvements, modifications or additional infrastructure that may be considered over time.