News

Frogmore Road Concept Plan now open for consultation

18 November 2026

In response to your feedback and further investigations, we're proposing the following improvements:

  • Road renewal and drainage: Renew the road between Valletta Road and Linear Park. Kerb realignments between Harrow Road and cul-de-sac would reduce damage from established gum tree roots, improve stormwater flow and reduce water pooling.
  • Walking and cycling connections: Provide a continuous 2–2.5-metre-wide shared path along the eastern side of Frogmore Road, connecting Valletta Road, the local shops and Linear Park. This minimises impacts on established trees, with narrowing and specialised paving treatments in certain areas to protect tree roots.
  • Road safety: Tighten intersection corners at Festival Crescent and Elm Street to encourage slower turning speeds and create additional planting opportunities. A raised crossing at Elm Street would improve shared path connectivity.
  • Tree protection and greening: Retain established trees wherever possible, with additional planting and gradual replacement of ageing trees to improve consistency in tree species and maintain the street's leafy character.
  • Local centre improvements: Introduce angled parking alongside Valletta Reserve and a raised pedestrian crossing to improve access between the local shops, reserve and shared path.

Your input will help shape the final design for Frogmore Road.

View the concept design here and have your say by Monday 14 December 2026.